For the six months ended 30 September 2026
18 November 2026
Highlights
- Delivered record £2.6bn capital investment, with ~70% invested into regulated electricity networks.
- Interim results of 66.5 pence adjusted EPS in line with expectations, reflecting strong operational performance and accelerating regulated investment.
- Five-year £33bn investment plan being delivered at pace:
- Construction commenced in full or in part on all 11 major Transmission projects.
- Momentum continuing on Dogger Bank, with around 150 turbines now installed across the project.
- Flexible thermal responding to increasing system needs as build-out of new plant continues in Ireland.
- Unchanged confidence in strong 2026/27 adjusted EPS of 168–193 pence, alongside a reaffirmed 2029/30 adjusted EPS target of 225–250 pence.
Martin Pibworth, Chief Executive, said:
“A year ago, we set out our five-year £33bn investment plan to transform SSE for growth. Today, from the Highlands to the North Sea, that plan is translating into infrastructure on the ground, supporting lower bills and providing greater energy security.
“We’ve invested a record £2.6bn in the first half, around 70% of it in regulated electricity Networks, alongside strong progress in Renewables and Flexible generation. Our plan is connecting more homegrown power, supporting economic growth and, ultimately, helping build a more affordable energy system.
“Deliver lasting value for customers and we can deliver lasting value for shareholders too. That’s the straightforward equation behind our investment plan. Our investment is delivering high-quality, regulated earnings, giving us confidence in the plan’s targets.”
| Financial Summary | Adjusted | Reported | ||||
| Sep 2026 | Sep 20251 | % | Sep 2026 | Sep 2025 | % | |
| Operating profit (£m) | 1,103.4 | 655.0 | +68% | 946.5 | 634.2 | +49% |
| Profit before tax (£m) | 999.7 | 523.7 | +91% | 908.1 | 586.3 | +55% |
| Earnings per share (p) | 66.5 | 36.3 | +83% | 35.9 | 26.4 | +36% |
| Investment & capital expenditure (£m) | 2,563.6 | 1,570.1 | +63% | 3,306.8 | 2,009.4 | +65% |
| Net Debt and Hybrid Capital (£bn)2 | 11.4 | 11.3 | +1% | 10.0 | 10.0 | 0% |
1 Comparative financial information has been restated, please see note 2.5 to the Interim Financial Statements
2 Reported net debt excludes equity accounted hybrid capital, see Alternative Performance Measures section
Financial performance
- Adjusted Earnings Per Share of 66.5p, in line with expectations reflecting strong operating performance and accelerating regulated investment.
- Regulated Networks contributed around two thirds of adjusted operating profits, including:
- A near-doubling of investment in SSEN Transmission driving a doubling of adjusted operating profit when compared to the prior period.
- Distribution operating profits flat as expected, demonstrating resilience alongside a step-up in RIIO-ED2 delivery.
- Renewables adjusted operating profit increased by around 20%, with higher output reflecting more favourable weather conditions and additions of new capacity.
- Increase in Flexibility operating profit, driven by stronger Thermal generation earnings reflecting increased volatility and commercial availability.
- Reported operating profit increased by around 50% to £947m, compared with £634m in the prior period, after exceptional items and certain re-measurements.
- Adjusted effective tax rate decreased to 6.3%, reflecting increased capital allowances associated with our accelerating investment programme.
- Record £2.6bn of adjusted investment and capital expenditure, a 63% increase, with around 70% invested in regulated electricity networks.
- Adjusted net debt and hybrid capital increased to £11.4bn, reflecting the continued growth of the capital investment programme.
- Interim dividend of 22.9 pence per share declared, being one-third of the 2025/26 full-year dividend and consistent with our stated dividend approach.
Strategic delivery
Networks
- Construction under way in full or in part on all 11 major SSEN Transmission projects, with delivery progressing across the business’s £22bn net investment programme to 2030.
- Transmission consenting continues to progress, with the EGL3 marine consent granted last week by the Scottish Government and 7 remaining decisions expected during 2026 and 2027.
- Significant progress across major Transmission projects, including Spittal-Peterhead HVDC, the Lewis Hub and Banniskirk substation.
- SSEN Distribution’s RIIO-ED3 Business Plan to be submitted in the coming days, with 50% higher baseline expenditure and uncertainty mechanism spend than in ED2 to support growing electricity demand, network resilience and affordability through electrification.
Renewables
- Continued installation momentum on Dogger Bank, with ongoing commissioning work at Dogger Bank A, 52 turbines installed on Dogger Bank B and cable installation on Dogger Bank C nearing completion.
- 1.4GW Berwick Bank B continues to progress towards FID in the second half of 2027, with preferred supplier agreements signed and around 60% of the total expected debt financing locked in at swap rates below 5%.
- Further growth opportunities continue to progress, including 2.9GW Berwick Bank A and C in the AR8 process, 0.8GW Arklow Bank where consent is expected in December 2026, and 1.4GW Coire Glas, which is awaiting Ofgem’s decision on a cap-and-floor mechanism.
Flexibility
- Strong commercial availability of around 94% across the Thermal fleet, supporting security of supply and capturing value from volatile market conditions.
- 470MW of new flexible generation progressing in Ireland, with construction at Tarbert and Platin on track for commercial operation in 2027 and 2028 respectively.
Financial outlook
- Our growing regulated, index-linked earnings base provides greater earnings resilience and visibility through periods of macroeconomic, political and regulatory uncertainty.
- We therefore remain confident in delivering strong 2026/27 adjusted EPS of 168–193 pence, while reaffirming our 2029/30 adjusted EPS target of 225–250 pence.
- We continue to expect full year 2026/27 adjusted investment and capital expenditure of over £5bn, with net debt continuing to be comfortably within our strong investment-grade credit ratings.
Key Performance Indicators
| Financial Performance | Adjusted | Reported | ||
| Sep 2026 | Sep 20251 | Sep 2026 | Sep 2025 | |
| EBITDA £m | 1,615.9 | 1,152.2 | 1,416.0 | 1,058.6 |
| Operating profit £m | 1,103.4 | 655.0 | 946.5 | 634.2 |
| Profit before tax £m | 999.7 | 523.7 | 908.1 | 586.3 |
| Earnings per share (EPS) pence | 66.5 | 36.3 | 35.9 | 26.4 |
| Interim dividend per share (DPS) pence | 22.9 | 21.4 | 22.9 | 21.4 |
| Investment and capital expenditure £m | 2,563.6 | 1,570.1 | 3,306.8 | 2,009.4 |
| Net debt and hybrid capital £bn | 11.4 | 11.3 | 10.0 | 10.0 |
| SSEN Transmission RAV – £m (100% basis) | 10,765 | 8,132 | ||
| SSEN Distribution RAV – £m | 7,109 | 6,093 | ||
| SSE Total Electricity Networks RAV – £m (100% basis) | 17,874 | 14,225 | ||
1 Comparative financial information has been restated, please see note 2.5 to the Interim Financial Statements
| Performance against 2030 Goals | Sep 2026 | Mar 2026 | Sep 2025 |
| Cut carbon intensity by 80% | |||
| – Scope 1 GHG intensity (gCO2e/kWh) | 191 | 194 | 200 |
| Increase renewable energy output fivefold | |||
| – Renewable generation output (TWh)1 | 6.5 | 14.5 | 5.4 |
| Enable low-carbon generation and demand | |||
| – Renewables connected in SSEN Transmission network area (GW)2 | 10.9 | 10.8 | 10.7 |
| Champion a fair and just energy transition | |||
| – Contribution to GDP UK and Ireland (£bn / €bn)3 | 9.66/1.36 | – | |
| – Jobs supported in UK and Ireland3 | 83,360/4,990 | – |
1 Includes pumped storage, battery energy storage systems, biomass and constrained-off wind in GB.
2 Transmission and Distribution connected capacity within the SSEN Transmission network area, includes pumped storage and battery storage.
3 Direct, indirect and induced Gross Value Added and jobs supported, from PwC analysis
| Safety Performance | Sep 2026 | Mar 2026 | Sep 2025 |
| Total Recordable Injury Rate per 100k hours (SSE & contract partners) | 0.16 | 0.17 | 0.16 |
Investor Timetable
| Interim ex-dividend date | 10 December 2026 |
| Record date | 11 December 2026 |
| Scrip reference pricing days | 10 – 16 December 2026 |
| Scrip reference price confirmed and released via RNS | 17 December 2026 |
| Final date for receipt of scrip elections | 8 January 2027 |
| Interim dividend payment date | 5 February 2027 |
| Q3 Trading Statement | Early February 2027 |
| Trading Update | Early April 2027 |
| Preliminary results for the 12 months ended 31 March 2027 | 26 May 2027 |